Current / Recent Projects
|
List of Current Projects
- Beta Pump Station – City of Burnaby
- Commotion Creek Bridge – MOTI
- Shannon Lake Bridge – City of West Kelowna
- Zero Emission Pennask – Wind farm
- Fibreco
Project: Beta Pump Station
Description: Cast in place 1,200 m3, site grading, piping Wet Well and control bldg. construction
Project Scope: Concrete, Earthwork, Mechanical, Plumbing, Electrical, Building
Location: Burnaby, BC
Client: City of Burnaby/ Opus Dayton Knight
Description: Cast in place 1,200 m3, site grading, piping Wet Well and control bldg. construction
Project Scope: Concrete, Earthwork, Mechanical, Plumbing, Electrical, Building
Location: Burnaby, BC
Client: City of Burnaby/ Opus Dayton Knight
Shannon Lake Bridge Replacement and 2017 Bridges Maintenance - WEST KELOWNA, BC.
Scope: Construction of a new Cast In Place Bridge replacing the existing Shannon Lake Bridge that has been partially damaged by the flood, work including but not limited to road works, asphalt and paving, retaining walls, and sensitive environmental instream work including a diversion channel and cofferdam.
In addition to the main bridge work our scope included major repairs of 4 bridge structures.
Work completed couple of months ahead of schedule.
Value: $ 1,500,000 Date: Nov. 2017
Client: City of West Kelowna
Scope: Construction of a new Cast In Place Bridge replacing the existing Shannon Lake Bridge that has been partially damaged by the flood, work including but not limited to road works, asphalt and paving, retaining walls, and sensitive environmental instream work including a diversion channel and cofferdam.
In addition to the main bridge work our scope included major repairs of 4 bridge structures.
Work completed couple of months ahead of schedule.
Value: $ 1,500,000 Date: Nov. 2017
Client: City of West Kelowna
Commotion Creek bridge and HWY 97, Chetwynd, British Columbia
Scope: Construction of reinforced cast-in-place concrete bridge abutments on steel piles, 42 meter steel girders and cast in place bridge deck, in addition removal of 66,000 tonne of excavated material, 15,000 M3 of Rip Rap placement and approx. 1.5 Km of new highway construction. Scope included supply and install two lanes 40 meter long temporary bridge, project located 40 km West of Chetwynd, British Columbia.
Value: $ 4,900,000 Date: Nov. 2018
Client: Ministry of Transportation
Scope: Construction of reinforced cast-in-place concrete bridge abutments on steel piles, 42 meter steel girders and cast in place bridge deck, in addition removal of 66,000 tonne of excavated material, 15,000 M3 of Rip Rap placement and approx. 1.5 Km of new highway construction. Scope included supply and install two lanes 40 meter long temporary bridge, project located 40 km West of Chetwynd, British Columbia.
Value: $ 4,900,000 Date: Nov. 2018
Client: Ministry of Transportation
Project: Zero Emission Pennask-Wind Farm
Description: Total of 10 Turbine foundations. Supply, Mix, Deliver and Install 6,000m3 of concrete.Form, place and finish 10 towers.
Location: Summmerland, BC
Client: AMECFMS / Black & McDonald Joint Venture
Value: $ 2,560,000
Description: Total of 10 Turbine foundations. Supply, Mix, Deliver and Install 6,000m3 of concrete.Form, place and finish 10 towers.
Location: Summmerland, BC
Client: AMECFMS / Black & McDonald Joint Venture
Value: $ 2,560,000
Arcadia Creek Bridge - Enilda, Alberta
Owner: Alberta Infrastructure and Transportation
Owner: Alberta Infrastructure and Transportation
Description: Removal and construction of a steel plate girder bridge with cast-in-place concrete deck and steel H-piling
Highway 43 Repair – Grand Prairie, Alberta
Owner: Alberta Infrastructure and Transportation
Owner: Alberta Infrastructure and Transportation
Description: Controlled flame heat straightening of steel girder, girder diaphragm replacement and concrete repairs
Clayburn Bridge Replacement – Abbotsford, British Columbia
Owner: City of Abbotsford
Owner: City of Abbotsford
Description: Construction of reinforced cast-in-place concrete bridge on steel piles
Wildmare Bridge Replacement – Chetwynd, British Columbia
Owner: BC – Ministry of Transportation and Infrastructure
Owner: BC – Ministry of Transportation and Infrastructure
Description: Installation of Detour Bridge and construction of reinforced cast-in-place concrete bridge on steel piles