CAYOOSH CREEK BRIDGE- LILLOOET
Bridges and Infrastructure Projects
Bridges and Infrastructure Projects
Description: This proj ect involved the construction of a new two lane, single span, 52 metre long bridge with steel box girders, cast in place concrete abutments, retaining walls, deck and parapets; construction of approximately 400 metres of asphalt paved approaches; and demolition and disposal of the existing wood structured bridge.
DEH CHO BRIDGE
Bridges and Infrastructure Projects
Bridges and Infrastructure Projects
Description: Members of our team were responsible for all foundation and substructures work which encompasses 8 cofferdams with a total concrete volume of 5000 m3 followed by a conventional spread footing piers with a total concrete volume of 2000 m3 as well as steel superstructure construction. The bridge will span over the Mackenzie River in the Northwest Territories. In order to construct the piers, a temporary access bridge was built.
DONJEK RIVER BRIDGE REPLACEMENT
Bridges and Infrastructure Projects
Bridges and Infrastructure Projects
Description: The project consisted of the replacement of the existing Donjek River Bridge. Ruskin was responsible for construction of the new substructure foundation for the bridge.
ASHLU CREEK HYDRO PROJECT
Heavy Civil and Energy and Power
Heavy Civil and Energy and Power
Description: This project involves the construction of anintake and concrete spillway for the Ashlu hydroelectric project near Squamish, BC. Ruskin is responsible for the building, installation and removal of all form work, as well as placement of 1500m3 of concrete.
KSI ANDIGWAALEE BRIDGE REPLACEMENT AND EROSION PROTECTION
Bridges and Infrastructure Projects
Bridges and Infrastructure Projects
Description: This project involved the replacement of a single lane temporary Acrow bridge with a permanent two-lane 46-meter clear bridge founded on steel pipe piles. The bridge consisted of a steel superstructure and a cast in place concrete deck. The works also included additional rip rap erosion protection of approximately 900 meters along the creek channel, new grade approaches and pavement.
AURORA SYNCRUDE MINE SITE
Mining & Mine Services
Mining & Mine Services
Description: Supply of equipment and manpower for the construction and maintenance of tailings facility. This work is being completed through our AC&T First Nations Limited Partnership.